The City of Wichita Aquatics Master Plan Phase II called for the renovation of several of their pool locations. This renovation included demo of pool decks, underground piping, filter equipment, and existing fixtures and fencing.
Phase 2 includes Harvest Park. We installed new zero entry/wading pool, concrete decks, shade structures, water slides, earth mounds, filter equipment and piping, modify existing pool houses, and new landscaping. Linwood pool will be filled in to create a new spray ground/splash pad. This will include new concrete, spray features, play features, shade structures, filter equipment and piping, pool house roof modifications, and landscaping.