Marion Lake Spillway Bridge Replacement

We removed the existing three span concrete roadway bridges over the Marion Reservoir Spillway and replaced them with a new concrete beam bridge. The project involves removing a section from the top portion of the existing pier monoliths that is approximately 31’ long, 8’wide and 5’ feet high. This work was accomplished by using a concrete wire saw. The portion to be removed was cut to the correct elevation and removed in sections approximately 8’ X 5’ X 4’ long. While the construction is ongoing, access is being maintained to the machinery control buildings so the dam tainted gates can still be adjusted.
Location

Wichita, Kansas

Owner

City of Wichita

Role

Prime Contractor

Engineer

MKEC Engineering